Alkenes Topic 6C
The Topic 6C course on Edexcel A Level Chemistry provides approximately 17 hours of guided learning. Students work through four recorded video lessons, 90 marks of auto-marked MCQ practice, 332 marks of teacher-marked written questions, and a personalised spec-point progress report.
How the 17 guided learning hours are worked out
Guided learning hours are calculated from the actual contents of the course, not estimated. Video time is counted at its true running length, MCQs at 1.5 minutes per question, written answers at 1.5 minutes per mark, and time is allowed for reading the feedback returned on every quiz.
| Component | Time |
|---|---|
| Virtual lesson video | 143 min |
| MCQ practice (90 questions × 1.5 min) | 135 min |
| MCQ feedback review (5 quizzes × 10 min) | 50 min |
| SAQ practice (332 marks × 1.5 min) | 498 min |
| SAQ feedback review (12 quizzes × 15 min) | 180 min |
| Total | 1006 min ≈ 17 hours |
The four recorded lessons
The virtual lesson is delivered as four recorded lessons totalling 143 minutes. Students pause during exam-practice sections, attempt questions independently, then review the worked explanations and the mark-scheme approach.
| Lesson | Running time |
|---|---|
| 1. Alkene Bonding | 25 min |
| 2. Geometric Isomerism | 33 min |
| 3. Electrophilic Addition | 58 min |
| 4. Polymerisation of Alkenes and Polymer Waste | 27 min |
| Total video | 143 min |
Course preview
A short walkthrough of how the course is taught and how the assessment fits together.
What you get in this course
Four recorded lessons covering Topic 6C in full, with worked exam questions and mark-scheme strategy built into the teaching.
5 auto-marked quizzes of 18 questions each, with diagnostic feedback on every option. One attempt per quiz, so your scores track real progress.
12 written-answer quizzes (170 questions) marked by a specialist chemistry teacher, assisted by KASP, with per-mark feedback returned the following Monday.
28 of the 29 assessable Edexcel A level spec points in Topic 6C carry questions in the bank.
The lessons teach the chemistry and the exam wording. You learn what Edexcel actually rewards, not just the content.
A one-click PDF report shows your level on every spec point in colour-coded form.






David Jones (verified owner) –
The T6C Alkenes course really helped improve my understanding of the topic. The explanations go into detail and break the content down clearly, which made some of the harder ideas much easier to understand. I liked the way the lessons and resources work through the topic step by step, and the videos explain everything clearly so it’s easy to follow. Overall it really helped improve my understanding of Alkenes.
maryam (verified owner) –
This Alkenes course made the topic much easier to understand. The videos explain everything step-by-step and go through the details properly, which helped me follow the reactions and mechanisms a lot better. I also liked how the lessons connect everything together instead of just giving information, so the whole topic makes more sense when revising. It really helped improve my understanding of Alkenes and made the topic feel much clearer.